Carl Livingston Parks

Detailed-oriented and highly analytical Program Manager

LocationViennaUnited States
Government service6yrsNaval Sea Systems Command (NAVSEA)

About

Always having an interest in operations, manufacturing, and program management; throughout my professional history, 27 years active duty in DoD, I acquired a vast understanding of government relations and interacting with policy makers. I am known to be a creative and highly organized professional with substantial experience devising and implementing strategic operational plans and procedures with keen focus on increasing business efficiencies. I also have a strong international work experience. After leaving government work, I began a successful career in Aerospace Operations, Manufacturing, and Program Management.

Roles

Jun 2023–Feb 2025
Former role

Director – Rapid Structural Development & Manufacturing, New Glenn Upper Stage

Blue Origin

Reston, Virginia

Program Director
Jul 2022–Jun 2023
Former role

Director - Manufacturing, Operations & Assembly (Payload Accommodation Integration)

Blue Origin

Merritt Island, Florida

Director of Operations
Aug 2018–Sep 2021
Former role

PAPM, Production, Littoral Combat Ship (Independence)

Naval Sea Systems Command (NAVSEA), U.S. Navy

District of Columbia

Program and Project Management

Led the full lifecycle planning and execution for a $4.9B scoped ship production contract, delivering six new ships ahead of schedule.

·        Generated significant savings for reliability cost and change management by reducing required ship dry dockings by 40%.

·        Engaged with Navy leadership and policymakers to advance technical upgrades that achieved fleet operational readiness improvements.

●       Drove strategic discussions with U.S. Fleet Forces Command (USFFC) and COMNAVSURFPAC to influence Navy acquisition strategies.

May 2015–Aug 2018
Former role

APM, Production, Expeditionary Fast Transport

Naval Sea Systems Command (NAVSEA), U.S. Navy

District of Columbia

Program and Project Management

Directed policy and compliance efforts for a $2.4B scoped ship production contract, delivering four new ships on time and within budget. Achieved 10% increased performance in testing results by developing and leading engineering test events.

·        Established requirements and structure for new services / materials contract that enabled emergent work for each ship, reducing the timeline for contract work negotiation and execution by 50%.

●       Secured $45.5M+ savings in production costs by steering effort to innovate ship design in order to resolve corrosion issues.

●       Reached $44.9M in cost reductions while maintaining ship performance parameters by conducting technical review for new contract & award.